F&B Design & Build
Opening a restaurant, café or coffee shop in Dubai means landlord design codes, authority approvals, kitchen requirements and a fixed opening date — all at once. Crystal Fit delivers Food & Beverage (F&B) fit-out from concept to opening day: design, approvals, fit-out, MEP and custom joinery under one contract.
What’s included: interior design, landlord submissions and NOCs, Dubai Municipality food safety, Civil Defence (DCD) and DEWA approvals, MEP and kitchen coordination with your supplier, bar counters and joinery built for your menu, and handover with all completion certificates.
Built for service, not just for photos. We plan guest flow, bar and kitchen workflow, storage and seating capacity with your operations team, and coordinate the exhaust, grease trap, gas and fire-suppression details inspectors check before you open. Finishes are chosen to survive daily cleaning and heavy traffic.
Already have a designer or a brand book? We turn your drawings into an approved, buildable project. Send us the unit location and concept — we’ll come back with the scope and approval route.

How we work
- Step 01
BOQ & Agreement
- Step 02
Material Approvals
- Step 03
On-site Verification
- Step 04
Authority Approvals
- Step 05
Fit-out Works
- Step 06
Inspections & Snagging
F&B fit-out
What we deliver
Every Food & Beverage (F&B) project follows the same sequence. It starts with a detailed BOQ and one signed agreement for the whole scope. Before anything is ordered, you approve and sign the material samples — finishes, colours and fixtures.
Our team then verifies every project detail on site — measurements, existing services and the landlord’s requirements — and prepares the authority submissions: landlord NOC, Dubai Municipality food safety, Civil Defence and DEWA. Fit-out works start under one programme with weekly progress reports and finish with final inspections and snagging, completion certificates and handover before your opening day.
- Civil works, partitions, ceilings, flooring and finishes
- MEP and HVAC, kitchen exhaust, fresh air and drainage
- Grease trap, gas (LPG) and fire-suppression coordination
- Bar counters, display units and bespoke joinery from our workshop
- Signage, decorative lighting and final styling before opening

F&B design
What we deliver
- Concept architectural design with 3D visuals and drawings
- Detailed architectural design as per landlord requirements
- Detailed MEP design
- Dubai Municipality (DM) food safety drawings
- Kitchen and bar detail drawings (in coordination with the kitchen consultant)
- Material, lighting and FF&E schedule
- Joinery details
- Guidance through all steps
- Forms, registrations and AMC support
- BOQ template and fit-out tender process

Which approvals we handle
A Food & Beverage (F&B) unit cannot open without the landlord NOC and the authority permits: Dubai Municipality food safety and building permit, Dubai Civil Defence for fire-fighting and gas, and DEWA for the power load.
We prepare every submission, answer the comments and attend the inspections, running approvals in parallel with the works — so the doors open within the rent-free period.

Frequently asked questions
Do you handle Dubai Municipality and Civil Defence approvals?
Yes. We prepare the drawings and submit the landlord NOC, Dubai Municipality food-safety layout, Civil Defence and DEWA approvals, and attend all inspections until the completion certificate.
Which landlords have you worked with?
Emaar (Dubai Mall, Dubai Hills, Downtown, Creek Harbour), Dubai Holding, Nakheel (Palm Jumeirah), TECOM and others.
Can you work with our own brand designer?
Yes. We build from your designer’s concept and produce the technical and shop drawings needed for approvals, or deliver the full design ourselves.
Do you coordinate the kitchen equipment?
Yes. We work with your kitchen supplier on the layout, power, water, drainage, gas and exhaust points, so the equipment fits and passes inspection.
Can you build a kiosk in a mall?
Yes. We have built coffee kiosks in Dubai Mall and other malls, including night-shift works and mall-specific approvals.
How do I get a quotation?
Send us your floor plan or unit details through the form or WhatsApp. After a site visit and a short brief we prepare a detailed BOQ and a programme for your project.
Latest projects
Wala Coffee & Roastery
Roasters Specialty Coffee, Dubai Science Park
Panmi Coffee Shop Dubai Hills
Roasters Specialty Coffee House, Dubai Hills
YOY Neo Bistro Restaurant, Dubai
YOY Ukrainian Firecooking Restaurant, The Pointe, Palm Jumeirah
Roasters Specialty Coffee, Palm Jumeirah Mall
Roasters Specialty Coffee Kiosk, Dubai Mall




















